GigaplexBook a demoLog in
Illustrated solar park with battery storage in Nordic morning light
← All solutions

GIGAPLEX / BATTERY STORAGE / BESS

The right land.
For battery storage.

Find and compare land for battery storage. Review equipment, terrain and grid information together so your team can focus its investigation on promising sites.

GEOSPATIAL INTELLIGENCE
EXPLORE THE SOLUTION

GRID INFORMATION / BATTERY STORAGE

Land and grid.
One basis for your decisions.

A good battery storage site needs to work for both grid import and export. Gigaplex brings together network plan references for 139 grid operators and shows available grid information alongside land, mapped station proximity and your project’s power requirements.

139

grid operators with network plan references

01

Identify the grid operator.

See which grid area a site belongs to and who to contact about a connection.

02

Understand network development.

Review published network plans and available capacity indications. See planned upgrades and reported constraints where information is available.

03

Prepare the right grid questions.

Review grid information alongside the site and your project’s power requirements. Bring the context together for a more focused discussion with the grid operator.

Explore the grid information in a demo

The scope of available information varies by grid operator. Available power, connection costs and timelines are confirmed by the grid operator for each project.

FROM A NUMBER TO ITS CONTEXT

See the evidence.
Understand its context.

Grid operators, published network plans and source information. Brought together around the site, for a clearer next question.

The site’s grid context
01

The grid operator

See which grid area the site belongs to.

02

Network development

Review published network plans and area information.

03

The source behind the evidence

Keep source references, dates and status close at hand.

NEXT STEP

Prepare a more focused discussion with the grid operator.

Illustrated view of how the evidence connects. Connection point, available power and timeline are confirmed for the project.

01 / SITE CONDITIONS

Power and energy.
Room for the whole installation.

Explore early whether batteries, equipment and service areas fit on the land. Gigaplex brings layouts and geospatial information together so you can compare sites using the same project requirements.

THE INSTALLATION

Compare using the same requirements.

Specify power and energy capacity. Grid import and export are kept separate.

THE LAND

Explore the whole installation.

Review service areas, specified clearances, terrain and mapped obstacles.

GRID INFORMATION

Prepare for the grid discussion.

Compare mapped substations and take your project requirements to the grid operator.

GIGAPLEX / SITE ANALYSIS

Give storage the right site.

Land geometry, project power requirements and grid context. See the conditions together before choosing what to investigate further.

Scroll to see the evidence come together
01

Space for the whole installation.

Compare usable land, terrain and surroundings with the space required for batteries, equipment and service.

02

The grid gains context.

See grid operators, published network plans and available area information alongside the site.

03

A shortlist to take forward.

Compare alternatives on the same terms and carry the evidence into your team’s next assessment.

Conceptual visualisation of site analysis. Actual conditions are assessed for each project. Grid capacity and connection are confirmed by the grid operator.

Illustrated solar park with battery storage in Nordic morning light

GEOSPATIAL INTELLIGENCE

Understand the site.
Assess the grid context.

Geospatial intelligence connects land, the electricity grid and project requirements. Using geographic data and machine learning, Gigaplex helps prioritise battery storage locations and identify questions for further investigation.

01

Start with your battery storage. Power, energy and area requirements guide the comparison of potential sites.

02

See the grid in context. Compare mapped substations, distances, ground conditions and accessibility in one place.

03

Focus the next investigation. Take clearer site information to the landowner and grid operator. Connection and capacity are investigated further.

FROM SITE SELECTION TO PROJECT

Turn site selection
into a project.

01 / THE PROJECT

Continue working on the layout

Continue working on the site layout in the project workspace. Save alternatives and keep your team’s work connected to the same land area.

02 / THE PROJECT

Prepare a grid enquiry

Gather site details, import, export and a facility description in a draft enquiry. The grid operator can then assess the connection against project requirements.

03 / THE PROJECT

Gather the documents

Retrieve public documents from supported municipality and grid operator sources where available. Add drawings and track missing information.

FURTHER READING / GUIDEFind the right land for battery storage and BESS

FREQUENTLY ASKED QUESTIONS

The essentials.
Briefly explained.

Why do I specify both MW and MWh?

MW describes battery power; MWh describes how much energy it can store. Both are needed to describe the facility. Required grid import and export are specified separately.

How close to a substation can I search?

Choose a maximum straight-line distance of 0.5, 1 or 2 km to a mapped substation candidate. The map shows the substation and distance alongside the layout. The grid operator confirms the actual connection point, capacity and cable route.

How are safety areas included?

The layout includes area allowances and specified safety clearances. Battery positions are also checked against mapped buildings. Fire protection, unit spacing and manufacturer installation requirements are verified in subsequent project work.

Can I change the layout after searching?

Yes. Save the site in Projects and continue in Land & layouts. Changed equipment or positions require another review against the land, surroundings and project requirements.